Sandy Beach Runoff
Project |
|
The Sandy Beach runoff project
located on the north side of
Lake Miltona has been completed. |
|
The scope of the project was to
meter the water runoff by
building an earthen damn with a
metered height to create a
holding pond for the water to
settle in before running into
the lake. Many LMA members have
had problems with washed out
roads, beaches, and driveways
due to the runoff. The project
will also prevent runoff from
the farm fields draining
directly into the lake. |
|
Prior to the completion of the
project, heavy rains would make
the water at the Sandy Beach
access look like chocolate milk.
We know that Mother Nature
usually wins, but this will help
in most heavy rains to slow the
water down. |
|
|
|
|
|
|
|
|
|
|
|
|
|